Les Vardes
Our recently completed suspended ceiling and glass partitioning project; Crittall style glazing in black with factory finish black full height doors, Entrance lobby with glass doors and factory finish black ironmongery
A recently completed project to create new offices, meeting rooms and storage. Full decor of the premises including silicone jointed glazing a storage wall system new Wenge doors and flooring throughout
RECENT PROJECT FOR WILLIS TOWERS WATSON
BEFORE & AFTER PICTURES OF A RECENT PROJECTS
HIRZEL COURT PROJECT
OFFICE FIT OUT PROJECT
DOREY COURT
Over the last 12 months we have been involved in the upgrading of Dorey Court at Admiral Park
Works have involved:
Complete strip out and refurbishment of various floors along with new toilets and a reception area
All new metal suspended ceilings throughout the open plan areas and new toilets
Full decoration of all finishes along with specialist finishes to beech joinery to a walnut finish
Refurbishment of the toilets to include new cubicle systems ceramics to walls and floors/Silestone worktops and joinery finishes
All new shower rooms/T point to include Whiterock panelling and vinyl flooring
Bespoke reception area including over 1200 meters of walnut cladding and bespoke reception counter and associated furniture. all new door and flooring
Main staircase and lifts upgraded to match all new finishes
We are now working for one of the new tenants on their total fit out
LORDES LUXURY CAR STORAGE
For this project, we have taken an old warehouse and turned it into a luxury car storage unit to include a new mezzanine floor with ramp to the first floor.
The installation included:
- Enclosed fire escape staircases and rear fire exit door
- New DDA compliant toilet and T point
- First floor enclosed office with T point and additional storage
- Air conditioning and air flow system plus a dehumidifier
- All new lighting and power along with a security system
- All new fire alarm system
- New exterior door and windows
FIT OUT FROM 2012
Complete fit out within a prestigious building starting with a substantial Comms Room and following on with all office space spread over 8 floors.
Working with G4S DWA and Architects Create
The installation included:
- Raised Access Floors
- Suspended Ceilings
- Folding Walls
- Fire and Acoustic Walls
- Specialist joinery including a bespoke reception and AV units
- Decor finishes
- Specialist glass products